Add to Cart
JCDRILL 200m Water Borehole spindle core drill rig for Soil and Rock Drilling
The spindle trailer type water well drilling rig is equipped with a pressure gauge instructions at the bottom
of the bore pressure, easy to master the hole.
The drilling rig has 8 grades forward rotation speed and 2 grades reverse rotation speed, wide speed
adjustable range.
Compact mechanical transmission structure, light weight, large diameter of spindle bore, hydraulic
stabilizer legs, good rigidity. Falling tower for hydraulic operation, convenient and reliable
Specification
Max.Drilling depth | m | 200 | ||||
Max.Drilling Dia. | mm | 500 | ||||
Max.Open hole Dia. | mm | 500 | ||||
End hole Dia. | mm | 75 | ||||
Drilling rod | mm | 42,50,60 | ||||
Drilling angle | 0-90° | |||||
Rotary Spindle | ||||||
Spindle forward speed | r/min | 64,128,287,557 | ||||
Spindle stroke | mm | 450 | ||||
Spindle inner diameter | mm | 62 | ||||
Spindle lifting capacity | Kg | 6000 | ||||
Spindle Max.Torque | N/M | 2400 | ||||
Main Winch (Hydraulic) | ||||||
Single line lifting speed | m/s | 17,35,75,151 | ||||
Tightrope diameter | mm | 12 | ||||
Hoist single line lifting capacity | Kg | 1800 | ||||
Roller diameter | mm | 245 | ||||
Roller cubic measure | m | 70 | ||||
Tools Winch | ||||||
Tightrope diameter | mm | 6 | ||||
Roller diameter | mm | 140 | ||||
Roller cubic measure | m | 450 | ||||
Drilling rig Power(choose one between the following two) | ||||||
Diesel engine | kw/hp | 16.13/22 | ||||
Electric motor | KW | 15 | ||||
Trailer | ||||||
Loading Capacity | T | 2.5 | ||||
Weight&Size | ||||||
Weight | kg | 1950 | ||||
Dimension | mm | 3300×1700×2500 |
Application
1.Civil water well
2.Geological exploration
3.Soil survey
4.Road and building exploration
5.Mind exploration on the ground
6.Blast hole
7.Borehole
8.Small foundation work
Certification
Delivery
FAQ
Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
| A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
|
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
| A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|
About us