Beijing Jincheng Mining Technology Co., Ltd.

Survival by quality, Development by credit!

Manufacturer from China
Verified Supplier
8 Years
Home / Products / Engineering Drilling Rig /

Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig

Contact Now
Beijing Jincheng Mining Technology Co., Ltd.
Visit Website
City:beijing
Province/State:beijing
Country/Region:china
Contact Person:MsTina Zheng
Contact Now

Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig

Ask Latest Price
Brand Name :JCDRILLS
Model Number :YGL-100Q
Certification :ISO,CE
Place of Origin :Hebei,China
MOQ :1Set
Price :Negotation
Payment Terms :T/T, L/C, D/P, Western Union, MoneyGram
Supply Ability :2000Set/Year
Delivery Time :In stock
Packaging Details :Standard export transportation package
Model :YGL-100Q
Rock Hardness :F=6-20
Type :Rotary Drilling Rig
Usage :Anchor Drilling,construction
Drilling Depth :40-150m
Drilling Diameter :130-250mm
Air Consumption :11.3-25m3/min
Drill Pipe Length :3000mm
Hole Angle Range :0-90°
Rotary Speed :30-80 R/min
Rotary Torque :6000N.m
Power :57kw
Weight :6100Kgs
Drill rod dia. :76mm,89mm,102mm
Gradeability :24°
Feed Stroke :3.66m
Size :6900×2200×2200mm
DTH Hammer :DHD3.5,Ql-40 DHD340 DHD350Q DHD360
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Long Feeding Stroke Crawler Drilling Rig , Full Hydraulic Construction Drilling Equipment YGL-100Q

Diesel engine&electric motor drive available

Application

YGL-100Q Crawler Anchor Drilling rig is a kind of full hydraulic power head (top drive) multifunctional crawler drilling rig. This anchor Drilling rig can apply to the construction of big tonnage stress anchoring hole for water power station, railway, highway, drainage hole and geologic calamity fathering for landslide prevention and rock collapse.

Characteristics

1. The great rotary torque and long feeding stroke distance of the engineering drilling rig make the speed of borehole faster, the disposal capability of accident better and efficiency of drilling work higher.
2. Extension mechanism in the output spindle of top drive power head protects drilling tools effectively.
3. The gearshift mechanism of top drive power head adopts the hydraulic shift method which has the strongpoint of the quickness, convenience, reliability, etc. of the gearshift.
4. The hydraulic clamp & wrench device enormously decreases the assistant time and also reduces the intensity of operating work.
5. The chassis is of steel track with rotator, which makes the machine use easily.
6. Hydraulic elements are all selected from world famous brand products in order to achieve high reliability and performance stability.
7. It can be used with various drilling methods:

Non-cycle liquid dry auger drill

DTH hammer drill in rock layer by air

Mud circulation drill in sand soil layer

DTH hammer with tube drill in broken rock area by air

Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rigLong Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig

Specification

1 Drilling depth (m) 150 ~ 60
2 Drilling diameter (mm) Ф130 ~ 250
3 Drill size (mm) Ф89 × 2000, Ф127 × 2000
4 Power head output speed (positive&negative) (rpm) 37/74; 84/168
5 Power head maximum output torque (Nm) 6000
6 Power head stroke (mm) 2800
7 Power head maximum pull force (kN) 55
8 Power Head biggest feeding force (kN) 40
9 Mast slip stroke (mm) 500
10 Gradeability (°) 20 °
11 Slewing angle (°) 360 °
12 Diesel Power (kW) 75
13 Motor Power (kW) 37
14 Rig outside dimensions (transport status) (mm) about 5000 × 2000 × 2300
15 Rig mass (kg) about 4000
16 Options 1.high-speed fourth gear power head: 180rph

Packing& Delivery

Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig

Service

Long Feeding Stroke Engineering Drilling Rig , Full Hydraulic Crawler Drilling rig

In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate

Inquiry Cart 0